Office Trailers at Various Water Treatment Plants for NYC Environmental Protection (NYCDEP):

  • Oakwood Beach WPCP, Staten Island, NY.
  • 26Wards WPCP, Brooklyn, NY.
  • Wards Island WPCP, Manhattan, NY.

Scope of Structural, Electrical, Plumbing & HVACs Systems Design work included:
  • Design of new office / shower / locker trailers with connection to the existing building. The trailer consists of steel joists supported on concrete columns.
  • Design based on NYC Building Code included Accessibility requirement, Means of Egress, Access Travel Distance, Electrical, HVAC and plumbing inside the trailer and their connections with existing system.
  • Provided concrete foundation and other connection details.
  • Prepared drawings for NYCDOB approval.
  • Provided Construction Drawings & Specifications.
  • Providing Construction Administration and Controlled / Special Inspection

Scope of services included:

Phase 1 – Review of Existing Documents & Field Inspection;
Phase 2 - Schematic Design/Design Development;
Phase 3 – Development of Contract Documents;
Phase 4 – Obtain Permits from NYCDOB
Phase 5 - Construction Administrations /Controlled Inspection;
Phase 6 – Close-out, including Obtaining the Certificate of Occupancy