Condition Assessment

Structural Integrity Inspection & Rectification Details for 30,000 SF Community Center including inspection of Site Civil & Storm water Drainage System at Albany, NY for ICCD:

AEG provided structural integrity inspection and rectification details of 30,000 SF community center at Albany, NY for Islamic Community of Capital District (ICCD).

Structural Integrity Inspection included:

Inspection of 30,000 SF three story building including structural steel columns, bracings, connections, concrete floors, metal deck and joists, concrete floors and concrete retaining walls.

  • Indepth inspection of critical locations using hammer for sounding the concrete and to determine the section losses in corroded structural steel members;
  • Inspection of storm water management system and detention basins for proper disposal of storm water.
  • Preparation of report showing location and detail of proposed rectifications and deficiency photographs.
  • Review constructability based on the final drawings included details of all utility connection, sidewalks, ramps, curbs, pavement etc. in compliance with ADA requirements.

Site and Stormwater Management Inspection included:
  • Review of MEP, Utility and Topographic plans and verification of existing utilities and connection by conducting utility survey.
  • Review grading plan and storm water management practice in conformance with the new guidelines as provided in the DEC’s Design Manual.