De-Construction of Water Tower at Bowery Bay WPCP—Queens, NY for NYC Environmental Protection (NYCDEP):

AEG provided de-construction details/procedures and obtain approvals from NYC Department of Buildings - Crane & Derricks and BEST. Additionally AEG provide site safety and inspection during de-construction of 110’-0” high steel water tower at Bowery Bay WPCP, Queens, NY

Scope of work included:

  • Calculation of the loads to be lifted in three phases and selection of the crane type with boom length required to carry these loads.
  • Verified if crane’s operation load is within the allowable bearing pressure at each boom swing radius; crane stability for wind load during lifting; design lifting system; develop demolition procedure; stages of demolition with crane lifting radius etc.
  • Prepared drawings and calculations to obtain NYCDOB-Crane & Derrick approval.
  • Prepared Site Safety Plan for BEST approval.
  • Provided expediting services to obtain approval from NYCDOB-C&D & BEST.
  • Provide Site Safety & Inspection during de-construction of steel water tower.