Design & Inspection of Shoring & Utility Support for
Main Floor at Saint George Terminal, Staten Is., NY
for MTA-NYCT:
AEG provided design services to MTA-NYCT to support the existing
deteriorated concrete slab at main entrance to Saint
George Terminal in Staten Island, NY. Scope of work
included; review of existing documents and field
investigation to determine the condition of existing
slab to be supported, determine the availability of
space in occupied basement for shoring placement,
and to verify the locations of existing electric
conduits and HVAC ducts. AEG provided detail
drawings with specifications and cost estimate of
shoring to support existing slab with the limitation
of space availability under the floor. AEG
submitted design calculations and drawings for NYCT
approval.